论文部分内容阅读
介绍了合肥光源(HLS)二期工程储存环调试过程中遇到的一些现象,并对这些现象进行了初步定量或定性的分析.在现有硬件条件的基础上,采取了一些相应的措施,取得了一定的效果,HLS通用模式储存束流超过300mA,寿命好于8h,达到了设计要求.
Some phenomena encountered during the debugging of HLS storage ring were introduced, and preliminary quantitative or qualitative analysis of these phenomena was carried out. Based on the existing hardware conditions, some measures have been taken and some results have been achieved. The HLS general purpose model has a better than 8 mA of beam life of more than 300 mA and meets the design requirements.