怎样准备资料以便顺延工期

来源 :施工企业管理 | 被引量 : 0次 | 上传用户:fostervfr
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
施工合同约定:逾期竣工,承包人应承担高额的违约金。近年来,法院判决承包人支付数百万元甚至数千万元的逾期竣工违约金的情况屡见不鲜。承包人应该如何准备资料以顺延工期,免除逾期竣工责任,进而寻求补偿损失呢?近几年来,从最高院到地方法院,判决承包人支付数百万元甚至数千万元的逾期竣工违约金的情况屡见不鲜。如何防止发包人工期反索赔已成为了承包人不得不正视的问题。工期索赔是全过程索赔环节中最复杂的环节,也是承包人容易忽视的环节。因为非承包人原因造成的工期延误,一般均可顺延工期。 Construction contract: overdue completion, the contractor should bear a high liquidated damages. In recent years, the court ruled that the contractor should pay millions or even tens of millions of overdue liquidated damages are not uncommon. In recent years, from the Supreme Court to the district court, the judgment contractor to pay millions or even tens of millions of overdue liquidated damages The situation is not uncommon. How to prevent counterclaim of contracting man-days has become a problem the contractor has to face. Time claim is the most complex part of the whole process of claims, but also the contractor easily overlooked links. Due to non-contractor reasons for the delay caused by the project, the general may be extended duration.
其他文献
期刊
口吃是一种心病。说它是心病,是因为口吃极少是因为发音器官问题导致的,多是由于模仿、紧张、个性等心理原因逐渐强化而成的。一旦形成口吃,不仅会给人带来语言上的障碍,还会
胡锦涛同志在“七一”讲话中指出,“要紧密结合贯彻科学发展观的实践,加强党的先进性建设”,强调“坚持以科学发展观统领经济社会发展全局,坚持用科学发展观武装全党,进一步
跨越是桥梁工程的天职。但泰州长江大桥不仅又一次跨越了长江天堑,更以5个“世界第一”的壮举,跨越了桥梁建设领域的一个个极限高点。作为大桥的主要承建单位,中交二公局完成
摘要:本文以沈阳及衡阳两地法院工作报告未获人大通过为切入点,试图从宪法角度去考量法院向人大做工作报告的法律依据与法理基础,并分析法院工作报告未能通过人大审议的相关原因,最后提出相关建议,应明确此种情况下的院长问责机制。  关键词:法院工作报告;宪法;报告工作;问责  人民代表大会制度,是我国的根本政治制度。每年两会期间,全国人大听取一府两院的工作报告并予以审议通过已成为常态,而在地方上也同样如此。
期刊
期刊
期刊
数学方法是用数学语言表达事物的状态、关系和过程,经过推导、运算与分析,以形成解释、判断和预言的方法。而一般性数学方法作为数学方法的一种表现形式,与分类讨论法、数学归纳法等特殊性数学方法相比,它更适用于普遍性、基础性和一般性的数学应用领域,与小学生数学认知生活化、主体化、个性化的特点相符合,数学素养是指在个人的先天素质的基础上,受后天教育与环境的影响,通过个体自身的学习、认识和实践活动等所获得的数学