徐州华润电力有限公司机组设计容量4×320MW,燃用煤基本为火车混煤,经电厂铁路专用线运送至厂内站,再由机车送至两台翻车机系统;贮煤场配有两台悬臂式斗轮堆取料机,完成对来煤的存贮、混配及向原煤仓的供煤任务。针对输煤系统普遍存在的粉尘和积煤现象以及由此可能引发的自燃甚至爆炸的隐患,通过推行“四清”工作法,有效的提升了现场卫生保洁工作质量,具有一定的借鉴意义。
Xuzhou Huarun Power Co., Ltd. unit design capacity of 4 × 320MW, burning coal is basically a train mixed coal, power plant railway lines sent to the factory station, and then by the locomotive to two car dumper system; storage yard with two Cantilever bucket wheel stacker reclaimer, to complete the coal storage, mix and coal supply to the original coal warehouse tasks. In view of the dust and coal accumulation prevailing in the coal handling system and the potential spontaneous combustion and explosion which may be caused by this, it is of some reference significance to promote the quality of on-site sanitation cleaning effectively through the implementation of the “Four-clear” working method .