由于复杂的工程结构和特殊的地质条件,使长江三峡水利枢纽永久船闸地下输水系统在建设过程中,遇到了诸多出乎意料的标外项目。承担该工程施工任务的承包商对此始终抱以高度认真和客观求实的态度,依据有关的法规性文件和资料,恪守投标书中的各项承诺,在与业主、工程监理和工程设计等有关方面协商一致的前提下,在对各项技术方案和经济指标进行充分论证和量化分析的基础上,客观求实地反映问题。从而,较好地维护了业主与承包商之间各自的利益,保证了工程建设所要求的工期进度和工程质量。
Due to the complex engineering structure and special geological conditions, many unexpected underwater projects have been encountered in the construction of the permanent waterway under waterway system of the Three Gorges Project. The contractor undertaking the construction tasks always takes a high degree of seriousness and objective and realistic attitude, according to the relevant regulatory documents and information, abide by the commitments in the tender, and owners, engineering supervision and engineering design and so on On the premise of consensus through consultations and consultations, fully demonstrate and quantify various technical solutions and economic indicators and objectively and truthfully reflect the problems. Therefore, the respective interests between the owner and the contractor are well maintained, and the progress of the construction and the quality of the project required by the construction are guaranteed.