论文部分内容阅读
常吉高速公路项目概算总投资106.489亿元人民币,起点至沅陵段174.56公里为部分利用亚洲开发银行贷款建设,湘西自治州境内49.14公里为国内资金建设。其中国家投资29.671亿元,占总投资的27.86%;银行贷款76.818亿元(含亚洲开发银行贷款的3亿美元),占总投资72.14%。预计2008年底全线建成通车。其中常吉高速公路沅陵段主线全长102.5公里,连接线长4.7公里,全线设官庄、辰溪(三角坪)、沅陵3处互通式立交,预留马底驿互通口。全线共征用土地10584亩;拆迁房屋及附属物952户,面积158153平方米;开挖边沟近300公里;砍伐树木、青苗3526立方米,迁移坟墓4655座;改
The estimated total investment of Changji Expressway Project is 10,648.9 million yuan, with a starting point of 174.56 kilometers from Yuanling Section as part of the construction of loans from the Asian Development Bank and 49.14 kilometers of Xiangxi Autonomous Prefecture for domestic fund construction. Among them, the investment from the state was 2.9671 trillion yuan, accounting for 27.86% of the total investment; the bank loans were 7.6818 billion yuan (including 300 million U.S. dollars from the Asian Development Bank), accounting for 72.14% of the total investment. It is expected that the entire line will be opened to traffic by the end of 2008. The main line of Yuanling section of Changji Expressway is 102.5 kilometers in length and the connecting line is 4.7 kilometers in length. There are three interchanges at Guanzhuang, Chenxi (Triangle Square) A total of 10,584 mu of land will be requisitioned across the board; 952 houses and attachments will be demolished with an area of 158,153 square meters; dug ditches will be nearly 300 kilometers; trees and young trees will be cut down to 3,526 cubic meters and 4,655 graves will be relocated;