我厂压力机的传动轴瓦与连杆铜瓦相对于横梁和连杆的装配,在以前都是采用传统的挤压和锤击的方式进行。在我厂试制J31—250B型压力机过程中,因厂内现有油压机的工作台面较小,无法在油压机上进行对φ700外径的整体连杆瓦与连杆的挤压装配,直接影响了我厂生产的进度。为了保证我厂新产品试制的顺利进行,我们参考了国外的有关资料和国内兄弟厂的经验,进行了对铜瓦采用液氮冷缩装配的试验。经过对冷缩缸与冷缩工艺的数次改进,我们的试验获得了成功并及时投入了生产。投
The transmission bushings and connecting rod copper bushings of the press of our factory are relative to the assembly of the beam and the connecting rod in the way of using the traditional way of squeezing and hammering. In our trial J31-250B press process, due to the existing hydraulic machine factory work surface is small, can not be on the hydraulic press on the φ700 OD of the overall connecting rod and connecting rod extrusion assembly, a direct impact I plant the progress of production. In order to ensure the smooth progress of trial production of new products in our factory, we made reference to the foreign relevant information and the experience of the domestic brother factory, and carried out the test on the use of liquid nitrogen for shrinking the copper tiles. After several improvements to the cold shrink cylinder and the shrinking process, our trial was successful and put into production in time. cast