论文部分内容阅读
龙溪河梯级水电站是第二个五年计划期间建成的我国第一座由自己设计,自行安装的梯级水电站。根据“龙溪河梯级水电站计算机分级控制综合自动化”总体设计的要求,在狮子滩电站修建计算机一集控中心来实现以下四种控制方式:1.计算机分级控制方式;2.计算机—运动控制方式;3.集控台—运动控制方式;4.就地控制方式。为了满足多功能的要求,在设计中进行了较全面的综合考虑。新建筑位于狮子滩电站厂房区北
The Longxi River cascade hydropower station is the first cascade hydropower station in our country designed and installed by ourselves during the second five-year plan period. According to the “Longxi River cascade hydropower station computer grading control integrated automation” requirements of the overall design, at Shizitan Hydropower Station to build a computer control center to achieve the following four control methods: 1. Computer grading control; 2. Computer - motion control ; 3. Set control console - motion control mode; 4. Local control. In order to meet the multi-functional requirements, in the design of a more comprehensive consideration. The new building is located in the Lion Beach Power Plant plant area north