经过一个多月的克难攻坚,由长江科学院水利部岩土力学与工程重点实验室承担的新疆某水利枢纽工程坝基岩体特性研究专题正在稳步推进。该工程地处新疆北疆地区,拟建坝高240m,为水利部主管的第一高坝工程。坝址区岩体结构复杂,工程区极端温差超过80℃,建坝条件恶劣。为满足工程需要,勘测设计单位中水北方勘测设计研究有限责任公司委托长江科学院水利部岩土力学与工程重点实验室承担该水电站坝基岩体力学特性研究及建基面选择专题。专题研究工作于2015年10月初正式启动。尽管目前北疆已是白雪皑
After more than a month of hardship storming, the topic of research on the rock mass characteristics of dam foundation in Xinjiang, undertaken by the Key Laboratory of Geomechanics and Geotechnical Engineering, Ministry of Water Resources, Yangtze River Scientific Research Institute, is steadily advancing. The project is located in northern Xinjiang, the proposed dam height of 240m, the Ministry of Water Resources in charge of the first dam project. The rock mass structure of the dam site is complex. The extreme temperature difference in the project area exceeds 80 ℃, and the dam construction conditions are harsh. In order to meet the needs of the project, the survey and design institute, CSWRC, commissioned the Key Laboratory of Geomechanics and Geotechnical Engineering, Ministry of Water Resources, Yangtze River Scientific Research Institute to undertake the research on the mechanical properties of the dam foundation and the selection of building surface. Thematic research was officially launched in early October 2015. Although northern Xinjiang is already snow capped