Re-Os isotopic composition of the Dongling ⅢCD iron meteorite

来源 :Chinese Science Bulletin | 被引量 : 0次 | 上传用户:xuezhenlong0310
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Re, Os concentrations and Os isotopic compositions of the Dongling ⅢCD iron meteorite were determined by N-TIMS technique. The result was compared with that of the other irons and chondrites. The Re and Os concentrations of the Dongling iron meteorite were plotted on the trends of the group ⅢA and ⅣA irons. The Pt-Os relation of the Dongling iron meteorite is similar to that of the group ⅡA irons. That suggests a higher fractionation for the Dongling iron meteorite. Re, Os concentrations and Os isotopic compositions of the Dongling Ⅲ CD iron meteorite were determined by N-TIMS technique. The result was compared with that of the other irons and chondrites. The Re and Os concentrations of the Dongling iron meteorite were plotted on the trends The group-ⅢA and ⅣA irons. The Pt-Os relation of the Dongling iron meteorite is similar to that of the group ⅡA irons. That suggests a higher fractionation for the Dongling iron meteorite.
其他文献
进入二十一世纪以来,我国汽车行业取得飞速发展,为了满足现代社会对汽车质量和使用性能的要求,各职业院校必须高度重汽车的维修技术与保养教学的发展。职业院校是我国培养大
一、 概  述多年来,人们采用继电器、电子定时器、计数器及机械鼓形控制器等控制装置控制顺序型的设备和生产过程。复杂系统使用了成百上千个各式各样的继电器,查找和排除
治淮委员会勘测设计院自1955年初开始进行流域规划的水文计算,至1956年初结束。规划中水文计算的任务是利用全部水文气象资料综合整理、分析研究,按照流域规划各专业组(水利
对林业的有害生物的深入究竟,总结出了哪些病虫、鼠疫等对树木的影响,并归纳对其的预防和防治。 On the forestry of pests in-depth, summed up what pests, plague and ot
Based on HRTEM studies, the domain structure and the copper vacancy model of Dongxiang low-djurleite are discussed. The HRTEM images show: ( i ) The domain stru
阅读是语言教学的重要组成部分,培养学生的阅读能力是外语教学的重要目标。中等职业学校英语阅读教学应该根据学生的认知发展水平和就业需求,着重在英语词汇教学、学生的阅读
近年来,我国汽车数量日益增多,这些汽车内大都配有音响设备。因使用不当或其它原因引起这些音响设备损坏的情况时有出现。有些汽车收、放机,其电路结构并不算复杂,功能也不算多,但
本文叙述了摩托车检测系统的系统设计、检测方法。 This article describes the motorcycle test system design, testing methods.
四、洪水过程线1.典型放大与峯、量控制相结合的方法黄河流域规划中设计洪水过程线的绘制,按照以下两个原则:甲、模仿典型年洪水过程线。一般选实测洪水中较大的而洪峰发生
葛洲坝水电站是我国万里长江干流上兴建的第一个电站,就其装机容量和工程量而言,也是我国目前规模最大的一个水电工程。在设计过程中,遇到了一些比较复杂的技术问题,如泥沙