一、基本建设完成情况今年的基本建设工作因进行三反运动,使编制计划、设计、施工、准备等工作推迟,一般单位均在六、七月间开始进行。重工业部三工程处八月份开始施工,一二三厂锅炉房与二七厂等工程则是十月份开工的。各主要单位完成任务情况如下:截至十一月止,省工程公司原计划任务四万五千平方公尺,实际接受任务十一万平方公尺,并提前半月竣工;市工程公司原计划七万平方公尺,实际接受任务是十四万八千平方公尺,实际完成任务百分之九五点二七;第三工程处原计划八万平方公尺,实际接受九五、六五八平方公尺,包括冬季施工在内能完成百分之七九点九一(包括跨年度工程);交通工程处超额完成任务百分之十六。据十月底检查,×校建筑工程计划两万九千平方公尺,预计十一月二十日竣工。一二三厂计划任务六万四千平方公尺,在封冻前预计完成百分之八十;至十一月底,从完成基本建设主要工程计划工作量上看,该厂完成百分之六一點二三,经纬机械制造厂完成计划的百分之六八点五
I. Completion of Capital Construction This year’s capital construction work was postponed due to the three anti-campaigns, which delayed the preparation of planning, design, construction and preparation. The general units started their work in June and July. The three engineering departments of the Ministry of Heavy Industry started construction in August. The one-two-three-factory boiler room and the No.27 factory were started in October. The main units to complete the task as follows: As of November, the provincial engineering company originally planned 45,000 square meters, the actual acceptance of the task of 110,000 square meters, and completed half a month ahead of schedule; City Engineering Company originally planned 70,000 Square meters, the actual acceptance of the task is 148,000 square meters, the actual completion of the task of 95.27%; Third Agency originally planned 80,000 square meters, the actual acceptance of 95, 658 square Meters, including winter construction, will be completed by 79.91% (including the cross-year project); and the Transport Agency will exceed the amount of 16% by the end of the year. According to the inspection at the end of October, the x-school construction project is planned to cover an area of 29,000 square meters and is expected to be completed on November 20. The 1,243 plants planned a total of 64,000 m ^ 2 and expected to complete 80% of the total volume before freezing. By the end of November, from the workload of completing the major capital construction projects, the plant completed 61% Point two three, Jingwei Machinery Factory completed the plan of 68.5%