论文部分内容阅读
文章对老哈河玉皇段河段内现有老哈河大桥进行壅水分析计算、冲刷分析计算等,其计算结果说明工程的实施未造成壅水,造成的冲刷较小。
In this paper, the Laohahe River Bridge in Laohahe Jade Emperor section is analyzed, calculated and analyzed. The calculation results show that the project did not result in flushing, resulting in less erosion.