分析了当前贵州省已建成的24个监测点在建设中存在的问题,如通往站点及径流小区的交通不便、施工队伍技术水平不高、前期准备工作不充分等,从节省工程量、优化设施、减轻现场观测劳动强度、减少运行和维护工作量,实现监测点可持续发展的角度出发,建议在以后新的监测点建设中应重视站址选择、前期准备工作、集水设施优化、辅助设施配套、施工监督和验收把关等工作。
The problems existing in the construction of 24 monitoring points in Guizhou Province, such as the traffic inconvenience to the site and runoff plot, the low technical level of the construction team and the inadequate preparatory work in the previous period, are analyzed from the aspects of saving the engineering quantity, optimizing Facilities, reduce the labor intensity of observation on site, reduce the workload of operation and maintenance, and realize the sustainable development of monitoring points, it is suggested that site selection, preliminary preparation, water collecting facilities optimization and auxiliary should be emphasized in the construction of new monitoring points in the future Facilities, construction supervision and inspection and other work.