花篮梁是一个整体的梁.施工中必须一次浇注完毕。而有的工程队,在施工中不按图纸和规范要求施工,将花篮梁分为二次浇注,而且不注意结合面的处理,如再要加快施工进度,就容易出质量事故。我们为了使楼板牢固地坐在梁上,避免楼地面和顶棚裂缝,先将花篮梁的 T 字梁部分模板支好,将梁的钢筋绑扎好,再安放厚180毫米的中孔板,最后一次连续浇注花篮梁混凝土。这样既保证了梁板接头的整体性,双节省
The basket beam is an integral beam. The construction must be completed once. While some engineering teams do not construct according to the drawings and specifications during construction, the basket beams are divided into two castings, and the handling of the joint surface is not taken care of. If the construction schedule is to be further accelerated, quality accidents are likely to occur. In order to allow the slabs to sit firmly on the beams and avoid cracks in the floor and ceiling of the building, the T-beam section of the flower basket beam is first supported, the steel reinforcement is tied up, and the 180-mm thick middle hole plate is placed. Continuous pouring of basket beam concrete. This will not only ensure the integrity of the beam plate joints, double savings