对拦河坝工程设计基准期的探讨

来源 :水电站设计 | 被引量 : 0次 | 上传用户:efan913
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
一、设计基准期的含义人们在工作实践中发现,工程的失效概率(即工程的事故率)P_f与工程的使用年限t有关,一般具有如图1所示的关系。图1中的曲线,明显地把使用年限t分为三个时段,三个时段的失效性质是有区别的,兹分述于下。 1.第一时段称为早期失效率DFR(Decreasing Faiture Rate)。早期失效的特点是失效率非常高,但随着工程运行时间的增加,失效率迅速下降。在这一时段失效的原因,主要 First, the meaning of the design base period People in the work experience found that the project failure probability (that is, the project accident rate) P_f and the service life of the project t, generally has the relationship shown in Figure 1. The curve in Figure 1 clearly divides the useful life t into three periods, and the failure characteristics of the three periods are different and are described below. 1. The first period is called DFR (Decreasing Faiture Rate). Early failure is characterized by a very high failure rate, but the failure rate drops rapidly as the uptime of the project increases. The reason for failure during this period, mainly
其他文献
新疆地矿局在鄯善县境内发现一座白银矿区 ,是迄今为止新疆发现的第一座独立银矿。该银矿控制的矿体长 2 5 0m、厚 0 4m至 2 4m ,矿床规模属于中型。白银储量为 5 32t,铜储量为
现代教育技术改变了教学的模式,激发学生的学习兴趣;弥补了传统教学的不足,提高了教学的效率与质量;促进教育资源的共享,促使教育公平。然而,在实际教学的过程中,教育技术的
风鼓洞水电站位于湖北省宜都县,是一座用4km渠道引用风鼓洞和犀牛洞的泉水发电的小型水电站,装有1台800kW的机组,其水轮机的主要参数如下:型号QJ-W-92/1×11;设计水头184m;
本刊今年第3期刊登崔俊清同志《“野人与之块”正解》一文后,收到了不少读者的来信、来稿,不同意崔文的观点。现摘要编发阚绪良、殷达、陈延嘉三同志的来稿,并向其他来信、来
1 .论坛论题(1)青藏高原构造活动与地质环境 ;(2 )西北地区环境地质与地质灾害 ;(3)深埋长隧道工程地质问题 ;(4 )特殊土 (黄土、高原冻土、沙漠土、盐渍土、膨胀土 )工程地
花钱买信息,对现代商品社会来说是天经地义的。在当前国内调查业竞争日益激烈的时候,对于一个调查机构来说,独自占有调查信息则显得尤为重要。然而前不久,北京的IMI市场信息
摘 要: 通过对我院2013级高职护生中存在学习障碍的学生进行调查,对学习障碍产生的原因进行分析,以及解决的办法开展了有益探索。只要采取积极有效的措施,学校、老师、家长就要努力,提高学生兴致,改进方法,最终达到学生乐学、高效学习的学习效果。  关键词: 高职护生 学习障碍 成因调查 成因分析  学习障碍最明显、最易被人觉察的特征就是一般性学习落后。而对于在校大学生而言,学习障碍综合表现为“
引言 1988年11月至1989年1月底,加拿大魁北克省的萨格奈地区先后共发生了67次地震(M>0)。11月23日凌晨4点12分发生了一次震级为4.8 m_(bLg)的前震(本文中的时间都是东部时间
本文从多模态隐喻和转喻两方面着手,以2016年广东卷作文漫画为例,探析漫画中的多模态隐喻和转喻如何进行意义构建,同时探讨两者是如何相互作用传达意义,从而实现以图达意的目
(接上期)四、涉及我领土、主权和港澳台的禁用词1.香港、澳门是中国的特别行政区,台湾是中国的一个省。在任何文字、地图、图表中都要特别注意不要将其称作“国家”。尤其是