Introspection on improper seismic retrofit of Basilica Santa Maria di Collemaggio after 2009 Italian

来源 :Earthquake Engineering and Engineering Vibration | 被引量 : 0次 | 上传用户:wuzhiqing1984
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The 2009 L’Aquila, Italy earthquake highlighted the seismic vulnerability of historic masonry building structures due to improper “strengthening” retrofit work that has been done in the last 50 years. Italian seismic standards recommend the use of traditional reinforcement techniques such as replacing the original wooden roof structure with new reinforced concrete (RC) or steel elements, inserting RC tie-beams in the masonry and new RC floors, and using RC jacketing on the shear walls. The L’Aquila earthquake revealed the numerous limitations of these interventions, because they led to increased seismic forces (due to greater additional weight) and to deformation incompatibilities of the incorporated elements with the existing masonry walls. This paper provides a discussion of technical issues pertaining to the seismic retrofit of the Santa Maria di Collemaggio Basilica and in particular, the limitations of the last (2000) retrofit intervention. Considerable damage was caused to the church because of questionable actions and incorrect and improper technical choices. The 2009 L’Aquila, Italy earthquake highlighted the seismic vulnerability of historic masonry building structures due to improper “strengthening ” retrofit work that has been done in the last 50 years. Italian seismic standards recommend the use of traditional reinforcement techniques such as replacing the original wooden roof structure with new reinforced concrete (RC) or steel elements, inserting RC tie-beams in the masonry and new RC floors, and using RC jacketing on the shear walls. The L’Aquila earthquake revealed the numerous limitations of these interventions , because they led to increased seismic forces (due to greater additional weight) and to deformation incompatibilities of the incorporated elements with the existing masonry walls. This paper provides a discussion of technical issues pertaining to the seismic retrofit of the Santa Maria di Collemaggio Basilica and in particular, the limitations of the last (2000) retrofit intervention. Considerable damage was caused to the church because of questionable actions and incorrect and improper technical choices.
其他文献
【邮政局网站6月3日讯】为规范重大自然灾害期间赈灾包裹寄递服务和安全管理,保障寄递渠道安全畅通和救灾活动有序开展,近日国家邮政局、民政部共同研究制定并印发《赈灾包裹
生活自理能力是指儿童从依赖到独立的过程,即儿童从依赖成人的帮助到学习照顾自己的衣食住行等历程,简单地说,就是自我服务,自己照顾自己。它是一个人应该具备的最基本的生活
An efficient Galerkin meshfree formulation for three dimensional simulation of large deformation failure evolution in soils is presented. This formulation utili
汕尾万福黄金海岸住宅小区系由广东万福房地产有限公司综合开发。二○○六年即开工建设,二○○九年初建成交付使用,期间多次被邀请参加春秋季房展,评为“十大明星楼盘”“最
案例回放A公司参与一设备项目采购的投标后,对采购代理机构公示的评标结果颇感意外。因为A公司根据现场了解到的各投标单位的报价唱标情况,并结合招标文件的评分标准分析后认
一、薄板市场进入2004年后世界薄板价格依然呈上升态势,1月份加权平均指数达到了自1995年9月以来最高点。世界三大地区即东亚、北美和欧洲联盟均呈现走强势头。其中,北美和东
2011年2月20日,南京南站站房主体结构最后一根钢构件安装到位,南京南站站房工程历经22个月的艰苦鏖战圆满实现主体结构封顶。南京南站建筑面积45.8万m2,是京沪高铁 On Febru
黑河市公安交警支队把为黑河经济建设服务,振兴黑河经济作为衡量交警工作的重要标准。为确保国际经贸旅游大通道的安全畅通,根据涉外交通管理工作的需要, Heihe Public Sec
产业市场是原材料、零部件、设备、设施、系统及相关服务的交易市场。在产业市场经营过程中,企业主要通过价值让渡、整合传播、互动等手段,不断加强与客户联系,使其产品、服
花农老王的塑料大棚里栽培着稀有花草。在一个晴朗的秋末,中午时分大棚突然发生火灾,所有花草付之一炬,是大棚中的枯草着了火引燃的。然而奇怪的是,塑料大棚里没有一点 Flo