在哥斯达黎加,自然条件对建造重要水库不太有利,因此必须在其西北部的阿雷纳湖(图1)以外的地区建造热电站。由于桑克加多大坝高65米,阿雷纳湖的水位就有可能提高35米,可贮存流向大西洋岸的2×10~9米~3的水量。两个具70万千瓦功率的水力发电站各由6.5和8公里长的隧道供水,以便增高水位落差和灌溉国内较干旱的地区。阿雷纳水库从1978年9月20日开始蓄水,用了一
In Costa Rica, natural conditions are less favorable for the construction of important reservoirs, and therefore it is necessary to build thermal power stations outside the Arenal Lake (Figure 1) in the northwest. As the Sigmundo Dam is 65 meters high, the Lake Arenal water level is likely to increase by 35 meters and store 2 × 10 ~ 9 meters ~ 3 of water flowing to the Atlantic shore. Two 700 MW hydroelectric power stations are each supplied with 6.5 and 8 km tunnels in order to increase the water head gap and irrigate the more arid regions of the country. Arenal reservoir from September 20, 1978 began to impound, with one