论文部分内容阅读
在建设工程进行招标、投标的时候,按照《建设工程工程量清单计价规范》中国家规定的统一要求进行招标编制,并且要提供工程量的清单,最后的投标报价要通过投标人进行编制,最终以竞争的形式确定拟建工程的具体造价,这就是工程量清单计价。文章主要是探讨工程量清单模式在水利工程中造价控制的相关问题,对水利工程中各个阶段中造价控制的要点进行了分析。
In the construction of the project bidding, bidding, in accordance with the “construction project bill of quantities pricing” requirements of the Chinese unified requirements for tender preparation, and to provide a list of projects, the final tender offer to be prepared by the bidder, the final In the form of competition to determine the specific cost of the proposed project, which is the bill of quantities valuation. The article mainly discusses the problems related to the construction cost control in the water conservancy project, and analyzes the main points of the cost control in each stage of the water conservancy project.