论文部分内容阅读
竣工图是项目工程中重要的技术档案,凡涉及新建、扩建、改建、技术改造、技术引进的项目,在项目竣工时都要编制竣工图。在实践中,囿于施工管理不到位、工程人员制图技术欠缺等原因,竣工图编制存在一定问题。本文从明晰编制主体和编制规范、编制《设计变更情况一览表》、重新绘制与更改、使用竣工图章和形成编制说明等方面,对竣工图编制工作进行探析。
The completion plan is an important technical file in the project. All projects involving new construction, expansion, alteration, technological transformation and technology introduction shall be completed at the completion of the project. In practice, due to construction management is not in place, lack of engineering staff mapping and other reasons, there are some problems in the preparation of the completion plan. This article analyzes the compilation of the as-built drawings from the aspects of the clear compilation of the main body and the compilation of rules, the compilation of the “List of Design Changes”, the re-drawing and modification, the use of completed stamps and the formation of compilation instructions.