论文部分内容阅读
安徽广电新中心部分裙房为型钢混凝土劲性柱、大跨度型钢转换桁架结构,根据工程特点及施工技术关键点,采用工厂加工与现场制作单元构件相结合,桁架部分采用有支撑胎架高空分段吊装安装、同步对称卸载方法进行桁架施工。在施工技术分析的基础上,对施工全过程进行了施工监测,结果表明施工分析与现场监测吻合较好。
Some of the podium rooms in Anhui Broadcasting and TV Center are steel reinforced concrete columns and long-span steel truss structures. According to the engineering features and key construction techniques, the plant processing and on-site fabrication unit components are combined. Section hoisting installation, synchronous symmetrical unloading method for truss construction. Based on the analysis of construction technology, construction monitoring was conducted on the whole construction process. The results show that construction analysis is in good agreement with on-site monitoring.