国内各铸铁管厂处理连续铸管过程的轧熬(即铸铁管在连续浇注过程中管与铁水的脱节造成卡死)现象,一般采用两种方法(参见图1):1.启开花兰架1与平板5的连接螺栓4后,用千斤顶6顶起花兰架来脱开内外结晶器(2、3),再用行车把花兰架连同内结晶器2吊开,凿掉附在内外结晶器上的铁块,然后重新装配使用;2.用行车把内外结晶器一起吊出作报废处理,此方法造成人力物力的很大浪费。
The domestic cast iron pipe plant to deal with the continuous casting process of torment (that is, cast iron pipe in the process of continuous pouring out of the pipe and the hot metal caused by stuck) phenomenon, the general method of using two methods (see Figure 1): 1. 1 and the plate 5 connecting bolts 4, with a jack 6 jackie Chan to lift the mold from the inside and outside (2,3), and then drive the Orchid frame together with the inner mold 2 hanging, chisel off attached inside and outside Mold on the iron, and then re-use assembly; 2 with the drive to the inside and outside the mold hanging together for scrap, this method causes a great waste of manpower and resources.