论文部分内容阅读
9月4日,克拉2-14井不压井带压更换高压气井采气树作业顺利完成。这是继2008年克拉205井带压整体更换采气树之后,又一次成功实施的不压井换装作业。
September 4, Carat 2-14 well without pressure with high pressure gas well replacement gas well tree operations successfully completed. This is the second time since 2008, the Carat-205 well with the overall replacement of gas-tree pressure, the successful implementation of the non-pressure well refueling operations.