集团公司苏州轨道交通四号线2标项目部,承担着安元西路站、春申湖路站两座车站和全长6777米的三个盾构区间施工任务。该标段工程量大,作业面多,工程下穿7条河流、5座桥梁、多座居民楼房及工业厂房,近距离下穿文灵路公路隧道,3.4米小间距隧道施工,富水粉砂地层中结构防水,地墙精度、质量控制难度大,技术复杂,而且工期紧张,给项目管理带来很大挑战。对此,项目部确立了以“强化团队建设,实现创新创造”为目标,始终坚持“以人为
Group 2 project department of Suzhou Metro Line 4 undertakes the construction tasks of two stations of Anshun West Road Station and Chunshenhu Road Station and three shield sections of 6777 meters in length. The project has a large amount of works and a lot of work surfaces. The project runs through seven rivers, five bridges, several residential buildings and industrial buildings. It is built with Wenling Road Tunnel, 3.4m small tunnel construction and water-rich silt Structural waterproof layer, wall accuracy, quality control difficult, complex technology, and tight schedule, to project management has brought great challenges. In this regard, the project department established to ”strengthen team building and innovation to create“ as the goal, always adhere to the ”people-oriented