我代表安徽省水利电力厅送变电工程处送电二队的职工,光荣的出席了这次群英大会,感到非常高兴。我热烈拥护党中央的指示,并保证带回去告诉广大职工,坚决贯彻。在党的社会主义建设总路线的光辉照耀下,我们队在大跃进的1958年,曾以20天的时间,以土法上马,用木搭架设了第一条横跨长江的高压输电线,在继续跃进的1959年,在党的八届八中全会的反右倾,鼓干劲的伟大号召下,又以24天的时间建成了响六输电线,为祖国电力建设史上,又增添了光辉的一页,这一巨大的成就,再次的证明了总路线、大跃进的伟大胜利。
On behalf of the Anhui Provincial Water Conservancy and Electric Power Agency, I sent the employees of the second power transmission unit of the Substation and Power Engineering Agency to the Group, and I am very pleased to attend this mass meeting. I warmly support the instructions of the party Central Committee and pledged to bring back to tell the broad masses of workers and staff members and firmly carry it out. Under the brilliant shining of the party’s general line of socialist construction, in 1958, during the Great Leap Forward, our team launched the first high voltage transmission line across the Yangtze River In 1959, with the great call of the eighth Plenary Session of the Eighth Central Plenum of the 8th CPC Central Committee to continue leaping, the six-power transmission line was built in 24 days. As a result, a brilliant one was added to the history of power generation in the motherland Page, this great achievement once again proves the great victory of the general line and the Great Leap Forward.