北京市轨道交通大兴线轨道工程80%以上为地下线,且存在较多的特殊减振结构,具有施工难度大,工期紧的特点。作为建设方,通过对施工筹划、工程质量、进度及轨行区实施有效的管理,保障了工程建设的顺利完成。施工筹划方面重点介绍铺轨基地的选址与建设、制定详细的施工总体计划、合理的资源配置等内容;工程质量方面介绍质量保证体系、工程材料管理、施工工序控制、工程质量评定等;进度管理方面主要介绍材料进度和施工进度的内容,制定了详细的轨行区施工作业调度管理办法加强轨行区的协调管理,取得了良好的效果。
More than 80% of the rail transit Daxing railway track project in Beijing is the underground line, and there are many special vibration-damped structures with large construction difficulty and tight construction period. As a constructor, through the effective management of construction planning, construction quality, progress and rail transit areas, the construction of the project was successfully completed. The construction planning focuses on the siting and construction of the laying track base, formulating the detailed construction overall plan and reasonable resource allocation, etc. The project quality introduces the quality assurance system, project material management, construction process control and project quality assessment, etc. Progress Management The main aspects of the progress of the material and the progress of the construction of the content of the development of a detailed rail line construction operation scheduling management methods to strengthen coordinated management of the rail sector, and achieved good results.