随着经济的不断发展,我国的交通业快速发展起来,其中地铁建设显得尤为重要。当地铁建设处在铺轨阶段时,土建、通信、信号、供电和风水电安装的多个项目存在平行施工或者交叉施工的情况,结合铺轨阶段的特点和专业施工的配合要求,预计出施工中会出现的专业接口和交叉界面,制定相关的管理措施和预防措施,本文对地铁建设轨道工程的现场协调和配合管理工作进行分析。
With the constant development of the economy, the transportation industry in our country has developed rapidly, and the construction of the subway has become particularly important. When the Subway Construction Department is in the stage of laying track, there are cases of parallel construction or cross-construction in many projects of civil works, communications, signal, power supply and feng shui power installation. Combined with the characteristics of laying stage and the cooperation requirements of professional construction, it is estimated that construction will occur Professional interface and cross-interface, develop relevant management measures and preventive measures, this article analyzes the on-site coordination and cooperation management of subway construction orbital engineering.