西林钢铁公司炼铁总厂1号高炉由100m~3扩容至130m~3大修改造工程顺利完工,于2001年10月5日正式投产运行,效果较为理想。 1 开炉前的准备工作 (1)所有设备应经过可靠的试运行,并备
The No. 1 blast furnace of Xilin Iron and Steel Company’s No. 1 blast furnace was successfully completed with the 100m ~ 3 capacity expansion to 130m ~ 3 overhaul and was put into operation on October 5, 2001 with satisfactory results. 1 Preparation before the start of the furnace (1) All equipment should be tested and ready for operation