论文部分内容阅读
一、概述自1998年长江发生大洪水后,党中央、国务院重点增加了对长江防洪体系建设的力度,在长江两岸、洞庭湖、鄱阳湖数千公里范围,展开大规模的堤防加固工程建设活动。堤防工程质量检测工作作为建设体系的一部分,日益受到建设、监理、施工等单位的重视。水利部长江科学院工程质量检测中心作为长江流域的最终工程质量检测单位,积极投入到堤防建设的热潮中,为堤防设计、工程质量监督、工程监理提供了量化的数据支持。
I. Overview Since the flood in the Yangtze River in 1998, the Central Party Committee and the State Council have increased their emphasis on the construction of the flood control system in the Yangtze River. Large-scale embankment construction projects have been carried out in thousands of kilometers across the Yangtze River, Dongting Lake and Poyang Lake . As a part of the construction system, the quality inspection of embankment works is increasingly valued by construction, supervision and construction units. As the final project quality inspection unit of the Yangtze River Basin, the Engineering Quality Inspection Center of Yangtze River Scientific Research Institute of the Ministry of Water Resources of China is actively involved in the upsurge of embankment construction and provides quantitative data support for embankment design, project quality supervision and project supervision.