论文部分内容阅读
日本神户钢铁公司加古川厂继1989年4号连铸机的第一流设备投产后,又着手建设该连铸机的第二流设备,用以生产厚板用连铸板坯。该设备巳于1992年1月投产,运转顺利,操作人员仅为传统连铸机的三分之一。该设备的特点如下:
Kakogawa Plant of Kobe Steel Corporation of Japan Following the commissioning of the first-class equipment of No. 4 continuous casting machine in 1989, the second-stream equipment of the continuous casting machine was started to produce continuous casting slabs for slabs. The plant was put into operation in January 1992 and is operating smoothly with only one-third of the operators in the traditional caster. The characteristics of the device are as follows: