1.前言目前,在建筑工程施工方法的现代化方面,基础工程的灌浆处理就其特点及合理化方面都是落后的。一方面灌浆作业由于受地质条件及地下水位的制约,要求熟练地控制浆液的灌注;另一方面其施工场地大多是分布在范围很广的廊道中,工作环境差,场地条件严苛。尤其是堆石坝工程,既要对基础岩层加以强化,还必须为提高其防渗性而进行精度高、工程量大的灌浆处理。为此,不仅需要改进灌浆方法,而且对灌浆液的制作、输送、灌注的控制和信息处理等各项作业,都要提高其精确度和速度。实现灌浆工程的全盘现代化已成当务之急。现研制了一个在灌浆施工过程中从接受灌浆材料到灌注
1. Introduction At present, in the modernization of construction methods, the grouting of foundation engineering is lagging behind in terms of its characteristics and rationalization. On the one hand, the grouting operation requires the skilled control of the grouting due to the constraints of geological conditions and groundwater level. On the other hand, most of the construction sites are distributed in a wide range of corridors. The working environment is poor and the site conditions are harsh. Especially rockfill dam project, it is necessary to strengthen the foundation rock, but also to improve its impermeability and high precision, large amount of engineering grouting. For this reason, it is necessary not only to improve the grouting method, but also to improve the accuracy and speed of various operations such as the preparation, transportation, pouring control and information processing of the grouting fluid. To achieve a full modernization grouting project has become a top priority. Now developed a process of grouting from receiving grouting material to perfusion