A Preliminary Analysis of Geologic & Seismologic Conditions for an Undersea Tunnel across the Taiwan

来源 :Engineering Sciences | 被引量 : 0次 | 上传用户:kenshin578212121
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The Taiwan Strait tunnel, as a great project, has been studied for a long time and met many challenges from the beginning of the feasibility study that has attracted attention among scientists and engineers on both sides of the Taiwan Strait and around the world as well. The key question is whether this undersea tunnel can be constructed with present technologies under such complex geologic and seismologic conditions. Results of current researches indicate that the sea floor of the Strait is covered with a horizontal layer composed of both the Pleistocene and the Holocene sandstone and shale with a thickness of about 200~300 m, without any large fault belt or fold.This can serve as a good bearing and impermeable layer for constructing such an undersea tunnel. The Penghu Islands and Penghu terrace, which are composed of hard basaltic rock over a wide area of 70 km (NS)×40 km (EW), might be connected each othar by a bridge instead of an undersea tunnel, and serve as a construction site. Although there are several geologic units separated by faults under the upper horizontal layer, these faults do not cut through the upper layer. Only the NE offshore fault along the Fujian coast and that along the west coast of Taiwan should be noticed, between which a suspension tunnel instead of an undersea tunnel can be constructed. Therefore it is judged that the tunnel beginning from Amoy, through the Jinmen Island and the Penghu Islands to the Peigang harbour is worth recommendation. The Taiwan Strait tunnel, as a great project, has been studied for a long time and met many challenge from the beginning of the feasibility study that has visited scientists and engineers on both sides of the Taiwan Strait and around the world as well. The key question is whether this undersea tunnel can be constructed with present technologies under such complex geologic and seismologic conditions. Results of current researches indicate that the sea floor of the Strait is covered with a horizontal layer composed of both the Pleistocene and the Holocene sandstone and shale with a thickness of about 200 ~ 300 m, without any large fault belt or fold. This can serve as a good bearing and impermeable layer for constructing such an undersea tunnel. The Penghu Islands and Penghu terrace, which are composed of hard basaltic rock over a wide area of ​​70 km (NS) × 40 km (EW), might be connected each othar by a bridge instead of an undersea tunnel, and serve as a constructio n site. Although there are several geologic units separated by faults under the upper horizontal layer, these faults do not cut through the upper layer. only the NE offshore fault along the Fujian coast and that along the west coast of Taiwan should be noticed, between It a judged that the tunnel beginning from Amoy, through the Jinmen Island and the Penghu Islands to the Peigang harbor is worth recommendation.
其他文献
健康信息资源的公益性开发是当今公立医学图书馆数字化建设的重要组成部分。针对互联网环境下健康信息服务无法满足公众对健康信息需求的现状,提出对不同类型、不同结构的健
Objective To prepare the animal model for the interventional therapy on intracristal and membranous ventricular septal defects (VSD) without extracorporeal circ
通过目前我国公路交通具体现状 ,结合丹本高速公路路面施工的特点 ,阐述了SBS改性沥青的作用基理、技术要求、施工工艺和方法及其在应用中应注意的一些问题 Based on the cu
截至2002年底,我国高速公路通车里程已达2.52万公里,已成为我国公路交通运输的主动脉。但是,随着里程数的增加,发生在高速公路上的交通事故也越来越多,高速公路事故增幅和在
位于欧亚大陆桥、徐宿淮高速公路交叉处,国家“五纵七横”国道主干线京福高速公路的咽喉工程——徐州枢纽互通立交桥于近日建成通车,这是迄今为止我国目前在建高速公路中占
BOT 是目前世界上盛行的主要的特许权投资方式。BOT 特许协议是东道国政府与私人投资者(本文仅指外国私人投资者)订立的协议。通过该协议,私人投资者获得建设、营运东道国某
受世人瞩目的大型汉字字典《中华字海》,目前已由中华书局和中国友谊出版公司出版发行。《中华字海》是国家“八五”规划重点图书,该书共收汉字8.6万多个,比《康熙字典》多
1984年秋,宁海县建设乡铜岭徐村徐定友承包的3.76亩荒芜毛竹林,采用“笋王”陈康飞建立产笋带、立竹带模式的经验进行竹笋高产试验,至1991年底4届(8年)的深翻改土、合理施肥
随着社会的不断进步,学前英语教学的目的已经不再简单的只是教会孩子们简单的几个英语单词就了事的,而是要适应儿童身心健康成长的发展规律,培养孩子们的英语发音、语感以及
机制凉席,又称工艺凉席,由于它具有凉爽、雅致、耐用等优点,深受国内外消费者的欢迎。目前市场畅销,工厂利润高,因此台湾客商纷纷而来,利用大陆丰富的毛竹资源,加工生产办厂