我厂铸工车间的3吨/时冲天炉(炉胆热风)在1979年年初于加料口下缘安装了余热水箱,解决了大炉工和浇注工夜班的洗澡问题。从半年多的使用情况来看,余热利用既安全又有成效,深得同志们的欢迎。现简介如下: 我们将加料口下缘直到密筋炉胆上缘的一段铸铁砖设计成整体的圆筒型的“热水器”,利用炉内物理废热对“热水器”内冷水进行预热。“热水器”与设在加料平台上的水箱相连,当冲天炉工作时,“热水器”内的冷水受热后,由
Casting plant in my factory 3 tons / hours cupola (furnace hot air) in early 1979 at the mouth of the feed inlet to install the remaining hot water tank to solve the large furnace and casting workers night shift bath problem. From more than six months of use, the utilization of waste heat is both safe and effective, and has won commendable welcome. The brief introduction is as follows: We will design a piece of cast iron brick on the lower edge of the feed mouth up to the upper edge of the dense tendon furnace as a whole cylinder type “water heater”, and use the physical waste heat in the furnace to preheat the cold water in the “water heater”. “Water heater” is connected with the water tank provided on the feeding platform. When the cupola is working, the cold water in the “water heater” is heated