论文部分内容阅读
近年来,中山市在水利建设中牢固树立“百年大计,质量第一”的思想,大力加强建设项目全过程规范管理工作,建立健全水利工程质量保证机制。岐江河综合治理、水榄排涝泵站、小隐水闸、大南围防船浪续建、横迳水库加固达标等一批重点工程质量达到优良,为全市经济持续发展提供了可靠的防洪安全保障。近年来中山市加大了水利基础设施建设力度。每年的水利工程建设投资均超过1.5亿元。为确保巨额投资不打“水漂”。市水行政主管部门在全省率先出台了《中山市水利建设程序试行办法》,明确规定重点水利工程未经安全鉴定不得超阶段进入可研、设计复查和初步设计阶段;项目可行性报告和初步设计未批准前,不予立项,不得开工。坚决杜绝边勘测、边设计、边施工的“三边”行为,防止产生“豆腐渣”工程。为彻底改变以往“工程质量看验收的”一站式“管理模式。
In recent years, Zhongshan City, firmly established in the water conservancy construction ”a hundred years, quality first “ thinking, vigorously strengthen the construction process of the whole process of standardized management, establish and improve water project quality assurance mechanism. A number of key projects such as comprehensive management of Qijiang River, Shuinan Drainage Pumping Station, Xiaoling Sluice, Dayanwei Ship Rescue continued construction and Hengliu Reservoir reinforcement met the standards and provided a reliable flood control and safety guarantee for the sustainable development of the city’s economy . In recent years, Zhongshan City, increased water conservancy infrastructure construction efforts. Annual investment in water conservancy construction projects are more than 150 million yuan. To ensure that huge investments do not fight ”water “. City water administrative department in the province took the lead in the promulgation of ”Zhongshan city water conservancy construction program pilot approach“, clearly stipulates that key water conservancy projects without security identification shall not be super-stage into feasibility study, design review and preliminary design stage; project feasibility report and preliminary Not approved before the design, not project, may not start. We will resolutely put an end to the survey, side-design, and side-by-side construction of ”trilateral“ acts to prevent the production of ”bean curd residue“ projects. In order to completely change the past ”quality of the project acceptance inspection “ one-stop ”management.