论文部分内容阅读
目前,ZPW-2000系列轨道电路为铁道部指定的我国移频轨道电路首选制式,是今后移频轨道电路的主流技术。在现场实践及不断的探索改进中,逐步总结ZPW-2000系列轨道电路调试和开通的试验方法,并将其应用于后续施工中,试验效果良好,大大提高了工作效率,为ZPW-2000系列无绝缘轨道电路设备调试及开通试验工作的顺利进行提供了技术保证。
At present, ZPW-2000 series of track circuits for the Ministry of Railways designated China’s frequency shift track circuit preferred standard, is the future of the track frequency shift track of the mainstream technology. In the field of practice and continuous exploration and improvement, and gradually summed up the ZPW-2000 series of track circuit debugging and opening test method, and its application in the follow-up construction, the test results are good, greatly improving the work efficiency for ZPW-2000 Series Insulated track circuit equipment commissioning and commissioning of the smooth progress of the work provided technical assurance.