论文部分内容阅读
2015年9月21日,中化吉林长山化工有限公司尿素装置节能降耗改扩建项目投料成功。该项目依托现有生产装置,充分利用现有场地及公用工程富余能力实现产能翻番。项目位于吉林省松原市前郭县长山镇长山工业园区,总投资11.98亿元,以褐煤为原料,气化部分采用先进成熟可靠国内自主知识产权的航天粉煤加压气化炉,配套国内最先进的氨合成和尿素生产技术。
September 21, 2015, Sinochem Jilin Changshan Chemical Co., Ltd. urea plant energy saving renovation project was successfully commissioned. The project will double its production capacity by relying on the existing production facilities and making full use of the available capacity of the existing venues and public works. The project is located in Changshan Industrial Park, Changshan Town, Qian Guo County, Songyuan City, Jilin Province with a total investment of 1.198 billion yuan. Using lignite as raw material, the gasification part adopts the advanced mature and reliable spaceflight pulverized coal pressurized gasifier with independent intellectual property rights The most advanced ammonia synthesis and urea production technology.