常州市工业、农业和基本建设的发展都较快,但是相对于全市其他行业来看,建筑设计、施工、建材生产的速度和质量不能满足工业发展的需要。例如,由于设计、施工、建材生产缺乏统一规划、统盘安排,标准设计做了一些,但构件品种繁多,加工厂还不能大量的定型生产,形不成生产线,设计标准化“化”不起来。施工机械发展了一些,但发展方向不明确,机械不能配套使用,手工操作量大。总的来看,设计标准化、生产工厂化、施工机械化这“三化”各搞各的,不能结合起来。如何进一步改变这种状况,是广大基建战线职工的迫切愿望。
The development of industry, agriculture, and infrastructure in Changzhou is relatively fast, but relative to other industries in the city, the speed and quality of building design, construction, and building materials production cannot meet the needs of industrial development. For example, due to the lack of unified planning and overall layout for design, construction, and building materials production, the standard design has been done. However, there are many types of components, and the processing plant cannot produce a large amount of stereotyped products. It cannot form a production line and the design standardization cannot be achieved. Construction machinery has developed some, but the direction of development is not clear, machinery can not be used in combination, and the amount of manual operations is large. In general, the “threeizations” of design standardization, production factoryization, and mechanization of construction each can not be combined. How to further change this situation is the urgent desire of the majority of infrastructure workers.