论文部分内容阅读
设备简介随着高炉设备的现代化钢产量不断增加,Dillin-gen钢厂决定在1959年年末增设一台浇注板坯的试验设备,此渣续浇注装置能浇注800×200毫米,1000×200毫米和1500 × 200毫米的板坯。这些尺寸的板坯恰好是现有厚板轧机用的坯料。Dillingen的连续浇注装置于1961年6月28日开始运转,当时采用单条浇注。由两座30吨OLP转炉供给钢液。图1是安装在Dillingen的试验设备的结构。其
Equipment Introduction With the increasing production of modern steel for blast furnace equipment, Dillin-gen Steel decided to add an additional test equipment for casting slabs by the end of 1959. The slag pouring unit can cast 800 x 200 mm, 1000 x 200 mm and 1500 × 200 mm slab. The slabs of these sizes happen to be the blanks for the existing plate mills. Dillingen’s continuous casting unit began operation on June 28, 1961, when a single shot was used. Two 30-ton OLP converters supply molten steel. Figure 1 shows the structure of the test equipment installed in Dillingen. its