论文部分内容阅读
日本于1999年建成了世界上第一座利用海水抽水蓄能的电站。该电站最大输出功率30MW,最大运行水头152m,最大流量26m~3/s。早在该电站建造之前的1981年就开始进行了6年的调研。对相关的潜在问题进行了分析研究、试验和计算机模拟,探讨在咸水包围中如何影响土木建筑物、电力设备和环境。海水抽水蓄能电站的工作开始于1987年,随后于1991年逐步进行建设。该项目的特殊性在于它实质上是一项示范工程。自从启动以来已进入到5年试验时
Japan built the world’s first power plant using seawater pumped storage in 1999. The maximum output power of the plant 30MW, the maximum operating head 152m, the maximum flow of 26m ~ 3 / s. Six years of research began in 1981 as early as the plant was built. Analyzes, tests and simulates related potential problems and explores how buildings, electrical equipment, and the environment can be affected in salt water encircling. The work of seawater pumped storage power station began in 1987, and then gradually progressed in 1991. The peculiarity of this project is that it is essentially a demonstration project. Has entered the 5-year trial since its inception