From the new Austrian tunneling method to the geoengineering condition evaluation and dynamic contro

来源 :Journal of Rock Mechanics and Geotechnical Engineering | 被引量 : 0次 | 上传用户:yxrlxggd
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The new Austrian tunneling method(NATM) is widely applied in design and construction of underground engineering projects. When the type and distribution of unfavorable geological bodies(UGBs)associated with their influences on geoengineering are complicated or unfortunately are overlooked, we should pay more attentions to internal features of rocks grades IV and V(even in local but mostly controlling zones). With increasing attentions to the characteristics, mechanism and influences of engineering construction-triggered geohazards, it is crucial to fully understand the disturbance of these geohazards on project construction. A reasonable determination method in construction procedure, i.e.the shape of working face, the type of engineering support and the choice of feasible procedure, should be considered in order to mitigate the construction-triggered geohazards. Due to their high sensitivity to groundwater and in-situ stress, various UGBs exhibit hysteretic nature and failure modes. To give a complete understanding on the internal causes, the emphasis on advanced comprehensive geological forecasting and overall reinforcement treatment is therefore of more practical significance. Comprehensive evaluation of influential factors, identification of UGB, and measures of discontinuity dynamic controlling comprises the geoengineering condition evaluation and dynamic controlling method. In a case of a cut slope, the variations of UGBs and the impacts of key environmental factors are presented,where more severe construction-triggered geohazards emerged in construction stage than those predicted in design and field investigation stages. As a result, the weight ratios of different influential factors with respect to field investigation, design and construction are obtained. When the type and distribution of unfavorable geological bodies (UGBs) associated with their influences on geoengineering are complicated or unfortunately are overlooked, we should pay more attentions to internal features of rocks grades IV and V (even in local but mostly controlling zones). With more attentions to the characteristics, mechanism and influences of engineering construction-triggered geohazards, it is crucial to fully understand the disturbance of these geohazards on project construction . A reasonable determination method in construction procedure, iethe shape of working face, the type of engineering support and the choice of feasible procedure, should be considered in order to mitigate the construction-triggered geohazards. Due to their high sensitivity to groundwater and in -situ stress, various UGBs exhibit hysteretic nature and failure modes. T o give a complete understanding on the internal causes, the emphasis on advanced comprehensive geological forecasting and overall reinforcement treatment is therefore more practical significance. Comprehensive evaluation of influential factors, identification of UGB, and measures of discontinuity dynamic controlling comprises the geoengineering condition evaluation and dynamic controlling method. In a case of a cut slope, the variations of UGBs and the impacts of key environmental factors are presented, where more severe construction-triggered geohazards emerged in construction stage than those predicted in design and field investigation stages. , the weight ratios of different influential factors with respect to field investigation, design and construction are obtained.
其他文献
为探究吕家坨井田地质构造格局,根据钻孔勘探资料,采用分形理论和趋势面分析方法,研究了井田7
期刊
随着当今世界城市化进程的加快、科学技术日益发展,建筑工程的规模也越来越大。因此在建筑工程中,高支撑模板施工技术因其跨度大、施工负载能力强及支撑稳定性好的特点而备受亲
本文介绍了包头市区建设1550nm光纤环网的方案:环形环网和树形环网相结合.A环和B环采用的是环形环网,特点是冗余性、可靠性好.C环由于路由原因,部分只能采用单路环的方案,优
高校教学改革项目管理系统拟实现个人申报、二级部门审批、二级部门上报、专家评审、中期检查、项目结项、项目评奖等功能.本教改项目管理系统的各个环节都可以通过网络进行,
目的:研究床旁结算在优化出院流程中的价值.方法:收集我院2018年2月-2018年4月按照传统出院结算流程办理出院的17892例次出院患者的结算时间、出院流程是否遭到投诉以及患者
现如今,新旧会计制度之间的衔接问题对于事业单位财务管理后期发展有着重要的意义与影响.本文从事业单位实行政府会计制度的重要性出发,研究与阐述了相关的会计制度问题.其次
The interaction between plates and foundations is a typical problem encountered in geotechnical engineering. The long-term plate performance is highly dependent
为探究吕家坨井田地质构造格局,根据钻孔勘探资料,采用分形理论和趋势面分析方法,研究了井田7
期刊
SMA改性沥青混合料是目前公路工程面层施工的主要材料,其具有较好的高温抗车辙以及低温抗开裂能力,SMA改性沥青混合料的施工过程也是特别需要严格控制的,尤其是对于温度的控制,其