论文部分内容阅读
综合接地系统,往往由站前单位负责施工,因而常在综合接地上出现问题。为了减少问题的发生,确保站后施工的可靠有序衔接,就综合接地的设计原则、技术要求、连接工艺、材质等进行阐述,确保综合接地施工质量。
Integrated grounding system, often by the front unit responsible for the construction, which often appear in the overall grounding problems. In order to reduce the occurrence of the problem and ensure the reliable and orderly connection of the post-station construction, the design principles, technical requirements, connection techniques and materials of the integrated grounding are elaborated to ensure the construction quality of the integrated grounding.