2017年4月17日获悉,投资8 000余万元的晋宁天然气管道二期工程计划于6月竣工通气,届时,含二街、昆阳、上蒜、晋城整个晋宁城区及工业园区,均能同时用上中缅管道气,预计每天的输气量可以达到350万m~3,每天的用气量约25万m~3。据介绍,总投资金额4 600万元的宝峰一期项目于2016年12月完成建设,建设门站、母站各一座,敷设高压管道7km,供气能力达15万m~3/h。目
It was informed on April 17, 2017 that the second phase of the Jinning Natural Gas Pipeline Project, with an investment of more than 80 million yuan, will be completed and ventilated in June. By then, the entire Jinning City and Industrial Park, including Second Street, Kunyang, Shangliao and Jincheng, At the same time, it is estimated that the daily gas transmission capacity will reach 3.5 million m 3 and the daily gas consumption will be about 250,000 m 3. According to reports, a total investment of 46 million yuan Baofeng Phase I project in December 2016 completed the construction of the gate station, a master station, the laying of high-pressure pipeline 7km, gas supply capacity of 150,000 m 3 / h. Head