佛子岭和梅山连拱坝基础运行中的工程地质问题与加固处理

来源 :水利水电技术 | 被引量 : 0次 | 上传用户:benben1906
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
佛子岭和梅山两座连拱坝(坝高分别为74米和88米)是建国初期建成的,二十多年来,在防洪、灌溉、发电、航运、渔业等各方面发挥了巨大的效益。运行情况表明,两座坝混凝土工程的质量是良好的;但是,由于当时对坝基存在的工程地质问题认识不足,在施工时,没有进行适当的处理,运行 The two arch dams, Foziling and Meishan (74 meters and 88 meters high, respectively) were built in the early years of the founding of the People’s Republic of China. Over the past 20 years, they have played a tremendous role in flood control, irrigation, power generation, shipping and fisheries benefit. The operation shows that the quality of the two dam concrete works is good; however, due to the lack of understanding of the engineering geological problems existing in the dam foundation at that time, proper treatment and operation were not carried out during construction
其他文献