创业水电站位于淮河流域沙颍河水系沙河干流上,距鲁山县城42 km,为引水式径流电站。渠首以上控制流域面积325 km2,多年平均流量4.93 m3/s。文章阐述了创业水电站更新改造工程,从电站概况、运行情况、存在问题和更新改造内容以及工程量、概算、工程效益等方面进行综合分析,在同类电站中具有一定借鉴作用。
Chuangye Hydropower Station is located on the main stream of Shahe River in the Shaying River System in the Huaihe River Basin, 42 km away from Lushan County, and is a diversion type runoff power station. The drainage area above the headrace is 325 km2 and the average annual flow rate is 4.93 m3 / s. This article elaborates the renovation and renovation project of Chuangye Hydropower Station. It makes a comprehensive analysis from the general situation, operation status, existing problems, contents of renovation and reconstruction, as well as engineering quantity, budget estimate and project benefit, which will be of reference for similar hydropower stations.