水电部科技司和水利水电规划院委托成都勘测设计院建造的自沙卵石推移质试验水槽鉴定验收会于1987年10月在成都举行。会议邀请了国内16位泥沙专家组成验收评审组。专家们在审阅了试验报告和现场观察了水槽输沙、卵石采样器效率试验后认为,水槽主体设施、量测仪器、辅助设备等经多次长历时的运行考验,各部分运转正常,形成了较为完整的试验体系。经过6个流量级(Q=1.00~3.50m~3/s)共32
Ministry of Science and Technology and Ministry of Water Resources Hydropower Planning Commission commissioned by Chengdu Institute of Survey and Design built self-gravel push bed quality test tank appraisal will be held in October 1987 in Chengdu. The meeting invited 16 domestic sediment experts to form the acceptance review group. After reviewing the test report and observing the experiment of sand tank sediment transport and pebble sampler efficiency test, the experts concluded that the main body facilities, measuring instruments and auxiliary equipment of the sink have been tested for many long-term operation and all the parts have been functioning normally. A more complete test system. After six flow levels (Q = 1.00 ~ 3.50m ~ 3 / s) a total of 32