论文部分内容阅读
本文结合桃林铅锌矿有底柱阶段崩落法施工设计的实践,探讨了倾斜矿体降低底盘损失的途径和方法。
In this paper, combined with practice of Peilian Lead-Zinc Mine with bottom-pillar caving construction design, the ways and methods of reducing the chassis loss of inclined orebody are discussed.